The reactor, commissioned by Petro Farhang and Energy Sepehr Holding and manufactured by Arak Machine Building Company, was installed on Monday.
Weighing approximately 360 tons, the reactor measures 6.5 meters in diameter and 11.7 meters in height. Constructed from carbon steel, it includes 2,815 internal tubes and marks the first time such equipment has been localized in the country.
Previously, 30 specialized process equipment units were also commissioned for the first time within subsidiaries of the holding, preventing tens of millions of dollars in currency outflow.
Your Comment