The vessel left the Keppel Verolme shipyard in
The Hummingbird is the second Sevan 300 unit to be built and the first cylindrical FPSO to be deployed in the
Chestnut has net recoverable reserves estimated at 6.5 million barrels of oil equivalent ("MMboe") and is expected to commence production at net rates of around 9,000 barrels of oil equivalent per day ("boepd").
Commenting on the news, Mike Wagstaff, Chief Executive said:
"This is another important milestone for Venture. The Hummingbird is an innovative re-usable flexible and low cost solution specifically designed to enable the development of remotely located stranded oil reserves. As well as a cost effective solution for Chestnut, it provides us with the option to redeploy it elsewhere in our portfolio in circumstances where a low cost floating production unit can deliver a more attractive return on capital than a conventional sub-sea tie back or ship-shaped unit."
PIN/OILVOICE.COM
Your Comment