The Darkhovin gas pipeline to the NGL 3200 plant was inaugurated today (Saturday, 7 Azar) by videoconference, with President Masoud Pezeshkian and Hamid Bovard, caretaker oil minister, in attendance. The project aims to collect and transport associated gas from the Darkhovin production facilities and supply feedstock to the plant.
Moving this gas to processing facilities eases the existing constraints on managing associated gas. It also makes economic use of hydrocarbon resources possible and prevents the gas from being flared.
A Step Toward Strengthening the Country's Gas Supply
Reliable gas supply in the cold season and management of the energy imbalance are priorities for the Oil Ministry. In this context, collecting and processing associated gas and returning it to the consumption cycle plays an important role in raising gas supply capacity and making optimal use of the country's production resources.
Associated gas is extracted from reservoirs alongside crude oil. Without suitable collection and transport infrastructure, it may be burned in flares. Expanding pipelines and processing facilities makes this gas available to various consumers and prevents the loss of energy resources. Associated gas is a valuable asset: if collected and processed, it can become petrochemical feedstock, industrial fuel and value-added products instead of burning in flares. Seen this way, associated gas recovery projects are an environmental measure and also part of the strategy to develop the oil industry's value chain and improve the economic productivity of national resources.
The Darkhovin-to-NGL 3200 pipeline was built with the same goal. With associated gas moved to the plant and processed, the capacity to use the region's gas production grows. This gas can help meet the country's energy needs, particularly on the coldest days of the year.
61-Kilometer Pipeline with a Daily Transport Capacity of 70 mcf
The project involves about 61 kilometers of underground 12-inch pipeline, designed to carry 100 million cubic feet of gas per day. The pipeline links the Darkhovin production facilities to the NGL 3200 plant and carries associated gas to it for processing.
Given the geography and obstacles along the route, construction required crossing various intersections, dirt tracks, waterways and other barriers. To control flow and improve transport safety, line break valve (LBV) stations were planned at kilometers 19 and 28.
An emergency shutdown valve (ESDV) and related protection and control equipment have also been installed at the head of the line, allowing flow to be controlled and gas transport to be shut off in an emergency.
Strengthening the Associated Gas Collection and Processing Chain
With the line in operation, associated gas from the Darkhovin facilities is being sent to the NGL 3200 plant and can be used as processing feedstock. Besides easing the constraints on managing associated gas, this improves the productivity of the facilities and the economic use of hydrocarbon resources.
Other effects of the project include less flaring of associated gas and less waste of energy resources. After processing, the collected gas can also be used in the energy supply chain of the region and the country.
Supplying gas to the power generation units west of the Karun and helping deliver their electricity to the national grid are other aims of the project. With the country needing more gas supply in winter, collecting and processing associated gas can also help strengthen supply capacity and manage the energy imbalance.
$17.5m Investment in Gas Transport Infrastructure
The Darkhovin-to-NGL 3200 pipeline project cost about $17.5 million. Work began in 2024 (1403), and commissioning and start-up had been scheduled for November 2026 (Aban 1405).
At about 61 kilometers, the line is an important piece of infrastructure in the associated gas collection and processing chain within the operating area of the Arvandan Oil and Gas Company. Besides helping reduce flaring and protect hydrocarbon resources, its operation increases the capacity to use associated gas and will help strengthen the country's energy supply and support the gas grid in the cold season.
Your Comment