Jofeir
-
Sixth drilling rig mobilized for Sepehr–Jofeir project
SHANA (Tehran) – The director of the Sepehr–Jofeir oil field development project announced the deployment of a sixth rig to the field’s drilling fleet, saying the rig has been installed at the “Northwest Jofeir” well. With the start of repair operations, the long-abandoned well will be converted into a producing well in the Gadvan formation.
-
Fourth drilling rig begins operations at Sepehr, Jofeir fields
SHANA (Tehran) – The project manager for the development of the Sepehr and Jofeir oil fields announced that the fourth drilling rig, named "MAPNA Nour-2," has begun operations to accelerate progress on the national development project.
-
Crude production hike of 30,000 bpd targeted for Sepehr, Jofeir fields
SHANA (Tehran) – The CEO of Pasargad Exploration and Production Company announced that oil production from the Sepehr and Jofeir fields has surpassed 50,000 barrels per day, with hopes to achieve a further increase of 30,000 barrels daily next year.
-
Sepehr and Jofeir Fields Oil Production rises to 51.000 b/d
SHANA (Tehran) - Oil production from the Sepehr and Jofeir oil fields has reached 51,000 barrels per day with the commissioning of well number 7 at the Jofeir field.