Jofeir

  • Sepehr-Jofeir oil field production set to hit 110,000 bpd by yearend

    Sepehr-Jofeir oil field production set to hit 110,000 bpd by yearend

    SHANA (Tehran) – Iran's Petroleum Engineering and Development Company (PEDEC) is targeting production of 110,000 barrels per day at the Sepehr-Jofeir oil field by the end of the current Iranian calendar year, the company's managing director said.

  • Sepehr-Jofeir field sets new production records

    Sepehr-Jofeir field sets new production records

    SHANA (Tehran) – Sepehr-Jofeir oil field has achieved new production records through the use of domestic expertise, innovative operational solutions and the continued completion, testing and commissioning of new wells, despite challenges posed during the Third Imposed War.

  • Sepehr and Jofeir output tops 34m barrels

    Sepehr and Jofeir output tops 34m barrels

    SHANA (Tehran) – Cumulative oil production from the Sepehr and Jofeir oil fields has surpassed 34.5 million barrels, according to a report presented at the 24th meeting of the Joint Management Committee for the fields’ development and production increase plan.

  • Sixth drilling rig mobilized for Sepehr–Jofeir project

    Sixth drilling rig mobilized for Sepehr–Jofeir project

    SHANA (Tehran) – The director of the Sepehr–Jofeir oil field development project announced the deployment of a sixth rig to the field’s drilling fleet, saying the rig has been installed at the “Northwest Jofeir” well. With the start of repair operations, the long-abandoned well will be converted into a producing well in the Gadvan formation.