According to POGC, the SPM has a loading capacity of 7,000 cubic meters per hour of gas condensate and was installed in the Persian Gulf on Monday evening (January 4, 2021) by the Seamaster Barge.
At present, the gas condensate of the phases of Pars 2 Region is sent to the SPM of phase 12 of South Pars for loading through a joint metering and with a sea pipeline, and the second SPM has bene installed with a 36-inch offshore pipeline with a length of 6.8 km.
Your Comment